Schedules, spec sheets, and the paperwork around them.
Short pieces on the documents a project needs from its products, written by an architect who makes them. No news, no cadence. A guide goes up when it is worth reading.
Guide Finish schedule: what goes on it, and how to make one Every surface in the project and what goes on it: the columns, which values come from the supplier, and how to keep the schedule right when the tile changes. 16 Sep 2026
Guide Sanitaryware schedule: what goes on it, and how to make one The bathroom schedule where a wrong row costs a wall: its columns, where each value comes from, and why the plumber needs it before the client has chosen. 16 Sep 2026
Guide How to make a spec sheet for interior design, step by step What goes on an interior design spec sheet, how to make one in seven steps, which format suits which reader, and the five mistakes that end in a site visit. 15 Sep 2026
Guide Lighting schedule: what goes on it, and how to make one Lumens, colour temperature, dimming, IP rating, driver. What a lighting schedule needs, where each value comes from, and how to skip the afternoon of retyping. 15 Sep 2026
Guide Spec sheet, cut sheet, tear sheet, schedule. Which is which Four names for the paperwork around a product, what each one is for, who makes it, and which one to send when someone asks for "the specs". 15 Sep 2026
Guide What is an FF&E schedule, and what has to be in it The document that lists every loose item in a project, what each column is for, who reads it, and why it goes stale between the first draft and the order. 15 Sep 2026